Job Hazard Analysis
Daily Site-Specific Safety Plan · JHA-2026
Job Information
Scope — Check Primary
Emergency Information
Nearest Fire Dept
Nearest Hospital (ER)
Nearest Urgent Care
VCTowers LLC · P.O. Box 1387, Milton NH 03851 · +1 603.507.1322 · contact@vctowers.net · vctowers.net
JHA-2026 · Page 1 of 3
VCTOWERS LLC
BUILT TO LAST · VCTOWERS.NET
Hazard Assessment
Tools · PPE · Controls · Weather
Identified Hazards & Controls
| Hazard | Present | Control Measure | Notes / Details |
|---|---|---|---|
| Fall Hazards | 100% tie-off · Anchor point verification | ||
| Dropped Objects | Exclusion zone · Tool tethers required | ||
| Weather | Monitoring · Thresholds defined below | ||
| RF Exposure | Lockout / RF monitor · Survey if required | ||
| Electrical | Clearance verification · LOTO if applicable | ||
| Traffic / Public | Barricades · Hi-vis PPE | ||
| Terrain / Footing | Site walk prior to work · Proper footwear | ||
| Manual Handling / Ergonomics | Mechanical assist · Proper lift technique | ||
| Other: |
⚠ Weather No-Go Thresholds
Thresholds confirmed pre-work. Deviation requires supervisor approval.
Tools & Equipment
Pre-Work Safety Checks
Personal Protective Equipment
Fall Protection Verification
Hazard Controls Confirmed
VCTowers LLC · P.O. Box 1387, Milton NH 03851 · +1 603.507.1322 · contact@vctowers.net · vctowers.net
JHA-2026 · Page 2 of 3
VCTOWERS LLC
BUILT TO LAST · VCTOWERS.NET
Rescue Plan & Sign-Off
Workforce · Stop Work Authority · Supervisor
Rescue Plan — Select One
Plan A — Self-Rescue / Assisted Descent
Use When
Conscious climber. Functional fall protection. No entrapment.
Requires: Rescue device · Secondary climber · Clear descent path
Plan B — On-Tower Pick-Off / Mech. Advantage
Use When
Injured or incapacitated climber. Self-rescue not possible. On-tower access feasible.
Requires: Qualified rescue climber · Rigging hardware · Rope · Anchor points
Plan C — External Emergency Response
Use When
Entrapment, severe injury, fire, structural instability, or uncontrolled hazard.
Requires: Emergency contacts verified · Site access confirmed · Responder access known
Rescue Readiness Verification
Workforce Sign-In
| Name | Ground | Structure | Certifications Held | Signature | ||||
|---|---|---|---|---|---|---|---|---|
| Climb | Rescue | Rigging | RF | CPR | ||||
Work Summary
Work Completed (include deviations from plan or issues encountered)
Stop Work Authority
Any crew member has the authority and responsibility to stop work immediately if an unsafe condition is identified. Work shall not resume until the hazard is resolved and supervisor approves restart.
SWA Acknowledged (Supervisor)
Work Resumption Authorization
Supervisor signature confirms hazard has been resolved and site is safe to resume operations.